JC Tiling SW · Responsible working

Health & Safety.
Built into our approach.

Quality workmanship starts with responsible preparation. At JC Tiling SW, we are committed to protecting our team, clients and everyone affected by our tiling work.

SMAS accreditedCHAS accreditedSaffron Walden · Essex · London
Our accreditations

A commitment to
safer working.

JC Tiling SW holds SMAS and CHAS accreditations. These support our commitment to health and safety management alongside the planning and controls needed for each individual project.

SMAS

Accredited

SMAS Worksafe is a recognised health and safety assessment scheme. Our accreditation forms part of our approach to demonstrating health and safety standards to clients and project teams.

Enquire about our SMAS certificate

CHAS

Accredited

CHAS provides contractor health and safety assessment. Our accreditation supports client pre-qualification, while site-specific risks and requirements remain central to planning our work.

Enquire about our CHAS certificate

For certificate details, validity dates or project-specific documentation requirements, contact Vasile Codreanu. Accreditation does not replace the assessment of risks on an individual site.

Our safety priorities

Careful planning. Practical controls.

We aim to improve our health and safety approach as projects develop and lessons are learned. Our priorities address the hazards relevant to wall and floor tiling, bathroom tiling and work within occupied properties or active construction sites.

Risk assessment & RAMS

We are committed to assessing the work, identifying who could be affected and agreeing suitable controls before starting. Risk assessments and method statements should reflect the actual task and site conditions.

Dust & material hazards

Tile cutting, drilling and preparation can create harmful dust. Our safety priorities include dust control, suitable cutting methods and assessment of adhesives, grouts and other products under COSHH.

Protective equipment

Protective equipment must match the task and assessed risks. This includes suitable eye, hand, hearing and respiratory protection where needed, alongside controls that reduce exposure at source.

Handling tiles & materials

Large tiles and heavy materials require careful planning. Access, storage, lifting aids and team handling should be considered to reduce unnecessary carrying, awkward lifting and injury risks.

Safe, organised work areas

Clear access routes, controlled work zones and orderly storage help protect workers and other site users. Equipment, electrical supplies and any work at height require appropriate checks and controls.

Communication & coordination

Our commitment is to coordinate with clients, principal contractors and other trades, follow site rules and raise safety concerns promptly. If conditions become unsafe, the work must stop until suitable controls are in place.

From preparation to completion

Safety throughout the project.

  1. Before work starts

    Discuss access, site restrictions, existing hazards and documentation requirements. Agree responsibilities, suitable working methods and emergency arrangements relevant to our work.

  2. During the work

    Keep communication open, maintain the agreed controls and respond to changes in conditions. Report hazards, incidents and near misses through the appropriate site arrangements.

  3. At handover

    Check the work area, address any remaining safety concerns and communicate relevant curing times or access restrictions before the area is returned to use.

Planning a project in Saffron Walden, Essex or London? Share your site requirements with us early so that health and safety can be considered alongside the scope, programme and finish.

Director-led responsibility

A clear point of contact.
A responsible approach.

Vasile Codreanu is the director and the person responsible for health and safety at JC Tiling SW. Contact him to discuss a safety concern, accreditation information or your project’s site requirements.